imaging parts going to shipping americas largest selection
In Stock. Ready to Ship | Family Owned Since 1964

Part Sales & Accessories

We sell used, refurbished, and system tested medical imaging parts. MXR has the largest selection of imaging parts in the USA with over 1,000,000+ parts available.

OEM Quality Parts - 1,000,000+ Medical Imaging Parts In Stock

America’s Largest Inventory of Medical Imaging Replacement Parts

OEMs We Support

MXR Imaging provides a vast selection of new, and used parts through our nationwide network. We stock one of the largest selections of parts for manufacturers, including:

imaging parts harvesting ct and mri
  • GE
  • Siemens
  • Konica Minolta
    • 20/20 Imaging
  • Canon/Toshiba
  • Guerbet
  • Hologic
  • Mavig
  • Fuji
  • Rayence
    • MyVet
  • Shimadzu
  • SonoScape
  • SonoSite
  • Philips
  • And more

And other leading OEMs

Parts by Modality

  • MRI (Magnetic Resonance Imaging)
  • CT (Computed Tomography)
  • PET/CT
  • X-ray (Fixed, Portable, & Digital Upgrades)
  • Ultrasound
  • C-Arms
  • Cath Lab
  • Mammography

The MXR Advantage for Imaging Parts

OEM-level quality at competitive pricing, typically 30% to 50% below OEM rates. MXR focuses on accuracy and speed to deliver the right part the first time.

Diagnostic Support

Minimize downtime and eliminate repeat fixes with direct access to MXR service engineers. Our experts help diagnose or confirm technical issues before you order, ensuring every purchase is a verified fix for your modality.

ISO 13485

High-quality OEM alternatives at a lower cost. Every part passes our ISO 13485 certified QA process and meets OEM specifications before shipping.

mxr imaging technician inspecting diagnostic imaging electronics
mri part testing facility mxr imaging

Repairs & Technical Services

Beyond part exchanges, MXR operates a dedicated electronics department and specialized technical labs to repair critical assemblies at the component level, not just replace them. Our expertise includes:

  • MRI Coils & Probe Repairs: We repair and sell these parts with several repair labs across the US.
  • Board & System Repair: Expert repair of critical system boards and computers for GE, Siemens, and Toshiba platforms.
  • Power Supply & Electronics: Specialized servicing for complex, multi-modality electronic assemblies and power supplies.
  • Magnet Cold Storage: Secure, monitored storage with 24/7 fixed-chiller support to maintain magnet stability and compliance.
  • Advanced R&D: Ongoing research and development to support custom engineering and innovation for legacy system support.
  • High-Voltage Tank Repair: Technical refurbishment of GE and Siemens CT and X-ray high-voltage tanks.

High-Demand Parts Ready for Shipment

MXR ships from strategic locations to get your equipment online fast. We stock high-demand parts for GE, Philips, Siemens, and Canon/Toshiba, including:

  • X-ray tubes and housing assemblies
  • MRI coldheads, compressors, and coils
  • CT detectors, power supplies, and brushes
  • Ultrasound transducers and probes (new, used, and repaired)
  • LCD screens, keyboards, and power boards for portable units
  • Hard-to-find parts for legacy and end-of-life (EOL) equipment

MRI Coil Repair & Sales

Lower MRI coil replacement costs with our repair and exchange programs. We stock new and reconditioned coils for all major MRI platforms, plus cryo-refrigeration, helium fills, and coldhead and compressor replacements to keep your magnet running.

MXR Highlights

  • 1M+ Parts in Inventory: America’s largest selection of ready-to-ship imaging parts.
  • 7 Nationwide Locations: Strategic distribution centers and repair labs.
  • Rapid Order Fulfillment: Fast shipping to minimize your downtime.
  • 1956 Founded: Established as Merry X-Ray Corp..
  • Family Owned & Operated: Transitioned to family leadership in 1964.
  • 2019 Rebranded: Evolved to MXR Imaging to reflect our expanded multi-vendor capabilities.
  • All Major Modalities Supported: Specialized parts for MRI, CT, PET/CT, X-ray, and Ultrasound.
  • 500+ Employees: Expert staff across the U.S.
  • 300+ Systems in Stock: Largest inventory of New & Used systems in the US.

Total Support: Beyond Parts

Beyond parts, MXR offers a full range of services to support your facility's growth and continuity.

MXR mobile MRI or CT imaging trailer providing flexible diagnostic solutions for healthcare providers.

Mobile Imaging Rentals

Interim fleet services to reduce patient backlogs during renovations or upgrades.

Mobile Imaging Units
shielding, galv room

Custom Shielding

Ensure optimal image quality and regulatory compliance with custom-engineered RF, magnetic, and radiation shielding services.

Custom Shielding
Professional clinical engineering training session with instructors and students using tablets and medical devices.

Staff Empowerment Training

Equip your medical staff with the technical proficiency needed to maximize system performance and improve patient outcomes.

In-House Empowerment Training
MRI CT MXR Medical Imaging Equipment Relocation

Site Planning & Relocation Services

Minimize logistical challenges during facility moves with professional de-installation, transport, and re-installation of your imaging assets.

Site Planning & Relocation Services
MXR's turnkey imaging project management shows imaging equipment placement on architectural blueprints for risk free CT, MRI, and X ray installation.

Turnkey Project Management

Our project management experts handle every aspect of your imaging suite build-out, from initial site planning to final installation.

Explore Turnkey Solutions
MI Gloves

Medical Supplies & Consumables

Access a reliable supply chain for daily radiology essentials, including contrast media, positioning aids, and radiation protection equipment.

Shop Medical Supplies

1Million+ Parts

Call (888) 278-9933

cta

Connect With a Specialist